Key points at a glance

  • Pressure vessels are installations subject to monitoring: pressure systems and their components are inspected before first commissioning, after modifications requiring inspection and at recurring intervals (Sections 15 and 16 of the Industrial Safety Ordinance, BetrSichV, Annex 2 Section 4).
  • Who inspects depends on the pressure-volume product, i.e. the maximum allowable pressure PS multiplied by the volume V. For simple pressure vessels, as fitted to most compressors: above 50 and up to 200 bar · l a qualified person for inspections (zur Prüfung befähigte Person) inspects; above 200 and up to 1,000 bar · l an approved inspection body (zugelassene Überwachungsstelle, ZÜS) inspects before commissioning and a qualified person at recurring intervals; above that, the ZÜS does both (Annex 2 Section 4 no. 6 Table 7).
  • For pressure vessels that must be inspected by a ZÜS, the maximum intervals are 5 years for the internal inspection and 10 years for the strength test; the external inspection is due every 2 years but can be omitted for unheated pressure vessels (nos. 5.6 and 5.8).
  • Where a qualified person may inspect, you set the interval in the risk assessment – 10 years at most; it must be determined no later than six months after commissioning (nos. 5.4 and 5.9).
  • You keep inspection certificates and records at the place of operation of the installation for its entire service life; electronic storage is permitted (Section 17 (1) BetrSichV).

Which pressure vessels are subject to inspection

Compressed air stores a great deal of energy. If a vessel fails because the wall has rusted through from the inside or the safety valve does not open, that energy is released in an instant. The Industrial Safety Ordinance (Betriebssicherheitsverordnung, BetrSichV) therefore counts pressure systems among the installations subject to monitoring (überwachungsbedürftige Anlagen) and governs their inspection in Annex 2 Section 4. The general rules for all installations subject to monitoring are explained in the guide “Installations subject to monitoring”; this guide deals with what stands in almost every company: the compressor with its air receiver.

Pressure systems include, among others, pressure vessel systems. What is inspected is the system and its components, i.e. the individual vessels together with their safety-related accessories such as the safety valve and pressure gauge (Annex 2 Section 4 nos. 2.1 and 2.2). In practice, two kinds of vessel matter most:

  • Simple pressure vessels under Directive 2014/29/EU: series-produced vessels for air or nitrogen. These include most air receivers on workshop and construction-site compressors. They are subject to inspection under Annex 2 from a pressure-volume product of more than 50 bar · l.
  • Pressure equipment under the Pressure Equipment Directive 2014/68/EU: all other pressure vessels, such as larger air receivers or receivers designed for higher pressures, vessels for other gases or liquids and expansion vessels. Pressure equipment under Article 4 (3) of the Directive, i.e. equipment below the category limits, is excluded.
  • Special cases with their own requirements: for a number of pressure systems, Annex 2 Section 4 no. 7 contains special inspection requirements, for example for refrigeration systems, expansion vessels in heating systems, cylinders for breathing apparatus and pressure vessels of fire extinguishers.
  • Which kind of vessel you have is shown on the nameplate and in the manufacturer's declaration of conformity.

The pressure-volume product decides who inspects

As a rule, an approved inspection body (ZÜS) carries out the inspection. A qualified person for inspections may only inspect where the tables in Annex 2 Section 4 provide for it (no. 6). The decisive figures are the maximum allowable pressure PS in bar, the volume V in litres and the product of the two. Both values are on the nameplate. A vessel with 90 litres and 11 bar comes to 990 bar · l, a vessel with 270 litres and 11 bar to 2,970 bar · l.

Table 7 applies to simple pressure vessels:

  • above 0.5 up to 30 bar

    Pressure-volume product PS · Vabove 50 up to 200 bar · l

    Inspection before commissioningqualified person

    Recurring inspectionqualified person

  • above 0.5 up to 1 bar

    Pressure-volume product PS · Vabove 200 up to 10,000 bar · l

    Inspection before commissioningqualified person

    Recurring inspectionqualified person

  • above 1 up to 30 bar

    Pressure-volume product PS · Vabove 200 up to 1,000 bar · l

    Inspection before commissioningZÜS

    Recurring inspectionqualified person

  • above 1 up to 30 bar

    Pressure-volume product PS · Vabove 1,000 up to 10,000 bar · l

    Inspection before commissioningZÜS

    Recurring inspectionZÜS

For pressure vessels that are pressure equipment under Directive 2014/68/EU and contain compressed air or other gases of fluid group 2, Table 4 applies with the same steps: above 50 and up to 200 bar · l a qualified person inspects; at more than 1 bar and above 200 up to 1,000 bar · l the ZÜS inspects before commissioning and a qualified person at recurring intervals; above 1,000 bar · l the ZÜS does both. Other tables with thresholds that are in part lower apply to flammable, acutely toxic or oxidising fluids (fluid group 1) and to liquids; in those cases you should consult Tables 3, 5 and 6 directly.

Inspection before commissioning

Before a pressure system goes into operation for the first time, it must have been inspected. The same applies before recommissioning after a modification requiring inspection (Section 15 (1) BetrSichV). The CE marking of the vessel does not replace this inspection: it confirms that the manufacturer has built the product in conformity with the rules. The inspection before commissioning looks at the system at its place of installation. Whatever the manufacturer has already examined and documented in the conformity assessment procedure is not examined again. The inspection covers (Annex 2 Section 4 no. 4.2, Section 15 (2) BetrSichV):

  • whether the necessary technical documents such as the operating instructions are available and their content is plausible,
  • whether the system including its components has been installed in accordance with the regulations and is in a safe condition,
  • whether the technical protective measures are suitable and functional and the organisational measures are suitable,
  • whether the intervals for the next recurring inspections have been set correctly.

For ready-to-use, series-produced pressure systems such as a compressor with a mounted receiver, there is a simplification: up to 1,000 bar · l, the ZÜS can carry out the inspection before commissioning on a sample without reference to a place of installation. The installation conditions at your premises may then be inspected by a qualified person (Annex 2 Section 4 no. 7.25). Whether this applies to your unit is shown by the certificate supplied by the manufacturer. For machinery with built-in pressure equipment, the inspection is limited to the documents under certain conditions.

Inspection register in AMS GoRecord compressors and pressure vessels with pressure, volume, type of inspection and inspector, get timely reminders of internal inspections and strength tests and file inspection certificates directly with the installation.

Recurring inspections and intervals

The recurring inspections of system components consist of an external inspection, an internal inspection and a strength test (Annex 2 Section 4 no. 5.5). The external inspection concerns the condition from the outside and the accessories; in the internal inspection the vessel wall is examined from the inside; in the strength test the vessel is usually subjected to a pressure test. Which intervals apply depends on who inspects:

  • Simple pressure vessel, ZÜS required (Table 7)

    External inspectionnot required

    Internal inspection5 years at most

    Strength test10 years at most

  • Pressure vessel, ZÜS required (Tables 3 to 6)

    External inspection2 years at most; can be omitted if the vessel is not heated by fire, exhaust gas or electricity

    Internal inspection5 years at most

    Strength test10 years at most

  • Vessel that a qualified person may inspect

    External inspectioncan be omitted for simple and unheated pressure vessels

    Internal inspectioninterval according to the risk assessment, 10 years at most

    Strength testinterval according to the risk assessment, 10 years at most; up to 15 years with proof

  • The pressure system as a whole is also inspected at recurring intervals; you set the interval in the risk assessment, and it must not exceed ten years (no. 5.3).
  • The inspection interval must be determined no later than six months after commissioning (no. 5.4). Whether it has been set correctly is established during the inspections; in the event of a dispute, the authority decides (Section 15 (2), Section 16 (2) BetrSichV).
  • Extending the strength test to 15 years requires proof, in the course of the external or internal inspection, that the system can be operated safely. The proof belongs in the documentation of the risk assessment (no. 5.9).
  • Due dates are stated as month and year. A recurring inspection is deemed to have been carried out on time if it took place no later than two months after the due date (Section 14 (5), Section 16 (3) BetrSichV).
  • Visual examinations in the internal inspection and pressure tests in the strength test can be replaced by other methods if a confirmed inspection concept is in place (no. 5.7).

Qualified person for inspections: what they must be able to do

The general requirements for qualified persons – vocational training, professional experience and recent professional activity – are set out in Section 2 (6) BetrSichV. For pressure systems, Annex 2 Section 4 no. 3 additionally requires, in relation to the inspection task in question:

  • relevant technical vocational training or a technical qualification sufficient for the intended inspection tasks,
  • sufficient knowledge of the associated body of rules,
  • at least one year of experience with the manufacture, assembly, operation or maintenance of the pressure systems or components to be inspected,
  • up-to-date knowledge of pressure hazards through training or instruction, for example on equipment and safeguarding concepts, inspection methods, evaluation of results and typical damage patterns.

The qualified person can come from your own company or be an external service provider, for example the compressor manufacturer's service department. Responsibility for ensuring that the person meets the requirements remains with you as the employer. If a pressure system consists exclusively of components that a qualified person may inspect, that person may also inspect the system as a whole (no. 6). More on selection and appointment can be found in the guide “Qualified person for inspections”.

Documentation: inspection certificate and records

The result of every inspection is recorded. If the ZÜS inspects, you request an inspection certificate from it. Records and certificates must contain at least (Section 17 (1) BetrSichV):

  • identification of the installation,
  • date of inspection,
  • type of inspection,
  • basis of the inspection,
  • scope of the inspection,
  • suitability and functionality of the technical measures and suitability of the organisational measures,
  • result of the inspection,
  • intervals for the next recurring inspections,
  • name and signature of the inspector and, for a ZÜS, also its name; for documents transmitted exclusively electronically, the electronic signature.

The documents are kept at the place of operation of the installation for its entire service life; you present them to the authority on request. Electronic form is expressly permitted. An installation subject to monitoring may only be used if the prescribed inspections have been carried out and documented (Section 4 (4) BetrSichV).

Between inspections: checks during operation

Years can pass between two inspections. Work equipment must therefore be checked for obvious defects before use, and protective and safety devices need a regular function check (Section 4 (5) BetrSichV). What has to be done in detail is specified in the manufacturer's operating instructions. These points are usually part of it:

  • Nameplate on the vessel present and legible, pressure and volume known
  • Declaration of conformity, operating instructions and inspection certificates to hand
  • Vessel recorded in the inspection register with inspector, type of inspection and next due date
  • Safety valve present, unaltered and function-checked according to the manufacturer's instructions
  • Pressure gauge working, permissible operating pressure identifiable
  • Condensate drained according to the manufacturer's instructions, automatic drain working
  • Vessel, weld seams and connections free of visible corrosion, dents or leaks
  • Installation stable, vessel accessible for inspection
  • Employees instructed on the basis of the operating instructions; defects are reported and the compressor is shut down in the event of safety-related defects

Free templates for this guide

As PDF and Excel, free – to use in your own company.

Frequently asked questions

Does the air receiver on a compressor have to be inspected by TÜV?

That depends on the pressure-volume product. For simple pressure vessels above 50 and up to 200 bar · l, a qualified person for inspections carries out the inspection. Above 200 and up to 1,000 bar · l and at more than 1 bar, an approved inspection body (ZÜS) inspects before commissioning and a qualified person at recurring intervals. Above 1,000 bar · l the ZÜS does both (Annex 2 Section 4 no. 6 Table 7 BetrSichV). Besides the TÜV companies, other approved bodies are also ZÜS.

How often does a pressure vessel have to be inspected?

If the ZÜS inspects, maximum intervals apply: internal inspection every 5 years at the latest, strength test every 10 years at the latest; the external inspection every 2 years is not required for simple pressure vessels and unheated pressure vessels. Where a qualified person may inspect, the employer sets the interval in the risk assessment, 10 years at most (Annex 2 Section 4 nos. 5.8 and 5.9 BetrSichV).

How do I calculate the pressure-volume product?

You multiply the maximum allowable pressure PS in bar by the volume V in litres. Both values are on the vessel's nameplate. A vessel with 50 litres and 10 bar has 500 bar · l. Instead of PS, a permissible operating pressure defined and documented by the employer may also be used (Annex 2 Section 4 no. 2.4 BetrSichV).

Is the CE marking sufficient as proof?

No. The CE marking and the declaration of conformity show that the manufacturer has built the vessel in conformity with the rules. The inspection before commissioning under Section 15 BetrSichV additionally looks at the installation, the protective measures and the inspection intervals in the company. For series-produced, ready-to-use pressure systems up to 1,000 bar · l, part of this may already have been inspected on a sample at the manufacturer; a corresponding certificate is then enclosed.

How long do I have to keep the inspection documents?

For the entire service life of the installation, and at its place of operation. This applies to inspection certificates from the ZÜS as well as to records made by the qualified person. The documents may be kept electronically and must be presented to the authority on request (Section 17 (1) BetrSichV).

This guide gives a general overview of German occupational safety law and does not replace legal advice. The regulations in force and the rules of the statutory accident insurance institutions are authoritative.

Organise occupational safety digitally

With the occupational safety software AMS Go you handle risk assessments, safety instructions, inspections and more in one system – mobile and with AI support.

Newsletter

Occupational safety, straight to your inbox

New templates, guides and changes to regulations – free from AMS Go. The newsletter is in German. You can unsubscribe at any time via the link in every email.

Privacy information

Contact

Get in touch

Book an appointment with us – or send us a message.

Kim Marius GräfeFrank MezlerLukas KleinBenjamin Kostrzewa

Personal and direct – with our founding team. Meet the founding team